Everything a Whole House Generator Installation in Asheville Includes
The visible part is a box beside the house, yet the real work sits in the pad, the panel and the fuel line behind it. Every whole home generator job we complete in Asheville includes these pieces, from first measurement to final inspection:
- Load calculation and generator sizing adds up the furnace, well pump, range and medical equipment to find the kilowatts the house needs.
- A concrete generator pad or an approved base sets the unit level and above the surrounding grade.
- An automatic transfer switch moves the house to the unit within moments of an outage and back again when the grid returns.
- Natural gas generator installation connects to the line that feeds the house, sized for the unit’s draw.
- Propane generator installation sets a tank on the property and runs the pipe to the pad.
- Clearances keep the unit at least 5 feet from windows, doors and openings, with 5 feet of space overhead.
- Panel work and conduit carry the wiring from the unit to the main panel or a subpanel.
- Permit and inspection go through the office that covers your address, and we schedule both.